Who We Are

ABS Excavating Ltd. (ABS) is a Saskatoon, SK. based heavy civil contractor offering services for local, municipal, provincial, and federal agencies. The company had its beginnings in 2010 when Austin Wur was still attending high school. Austin’s drive and work ethic quickly grew the single skid steer venture from working evenings and weekends, to the company it is today. ABS Excavating Ltd. originally was ‘Austin’s Bobcat Services’ until 2013 when the company incorporated and changed the name officially to ABS Excavating Ltd.

2013 was a big year for changes within the company. Along with the incorporation and new name, ABS Excavating Ltd. was approved to be a City of Saskatoon licensed Water and Sewer contractor which began our work with infrastructure.

Our Projects

  • Neault Road Primary Water Main Phase 1 & 2

    Neault Road Primary Water Main Phase 1 & 2

    ABS Excavating Ltd. was the general contractor on the City of Saskatoon project Neault Road Primary Water Main Phase 1 in 2019. The job entailed installing 1300 linear meters of 600mm C900 Primary Water Main including two valve chambers and 150 linear meters of 900mm DR11. In 2021, we were then awarded the 2nd phase of the job which included 500 linear meters of C900 Primary Water Main, 200 linear meters of 300-450mm Storm Sewer complete with 5 open cut highway crossings.

  • Lloydminster NW Drainage Project

    Lloydminster NW Drainage Project

    ABS Excavating Ltd. was awarded a contract in the City of Lloydminster as the general contractor, this was a NW Drainage Project where we moved over 60,000 cubic meters of earth embankment. We completed all area grading and topsoil removal and replacement. We also installed 20,000 square meters of Pyramatting for erosion control.

  • Martensville 3rd Avenue South Sanitary Replacement

    Martensville 3rd Avenue South Sanitary Replacement

    In 2020, ABS Excavating Ltd. completed a replacement project for the City of Martensville where we removed and replaced 3 city blocks of 200mm and 250mm SDR35 Sanitary Sewer as well as had over 30 short connections to the cities new main complete with a Sanitary Sewer bypass during construction. This also required us to complete the road reconstruction of the street.

Want to work with our company?